UW BIASCA: Engineering and production from a single source
Our long-standing business partner Siemens Schweiz AG has been awarded the contract to replace the existing 220kV AIS (air-insulated switchgear) in the BIASCA substation (canton: Ticino) with a new turnkey 220kV GIS (gas-insulated switchgear). The new system comprises a double busbar with a total of 11 bays, a reserve bay and a cross-coupler.
Realisation
Thanks to the close cooperation between our HEITEC sites in Erlangen and Slovakia, we were able to offer and implement a comprehensive solution for hardware engineering and cabinet construction - from the concept, base design and engineering to the production of 27 protection and control cabinets through to acceptance.
In August 2024, the factory acceptance test was carried out in Slovakia by the HEITEC team together with the project manager from Siemens Schweiz AG in accordance with precisely defined acceptance criteria. All steps of the factory acceptance were recorded in a written acceptance protocol and signed jointly. The control cabinets were then transported from HEITEC Slovakia to Switzerland.
Customer benefits
- One point of contact from planning to production
- High-level engineering for all voltage levels
- Latest generation of CAD/CAE project planning tools.
- The strengths of our group of companies, such as high flexibility, transparency, experience, reliability and adherence to deadlines, were utilised in the project